Tombstone installation process and precautions

Tombstone wholesale manufacturers share tombstone installation procedures as follows:

1. When installing the tombstone, it should be installed according to the structural drawing and various parts of the stone. The entire direction should be correct. When installing each tombstone, the entire tombstone area, vertical and horizontal should be on one line, and each area should be on the same horizontal plane. .

2. When installing the tombstone box, first make the surrounding box positive, which is proportional to the diagonal line, plus the joint point inside the box, right-angle link, and reinforce with coagulation mortar between the inner blood body and the surrounding body, the total error is in within 1cm.

3. The small pillars, cloud pillars or pillars installed on the handrail on the 2 side of the tombstone should be bonded with C25 cement with mortise processing materials, the verticality error should not exceed 2 mm, and the size of the handrail should be uniform in 4 circles.

4. When installing a non-spout, the mortise at the connection between the column and the accessories should be bonded with C25 cement as the processing material. The distance between the stone tablets should be determined according to the size of the tombstone. The upper and lower spacing should be uniform, and the verticality should not exceed 2 mm , the left and right spacing is uniform.

5. The setting of the tombstone is set in the groove of the stone tablet from top to bottom, and then sewed with cement to ensure firmness.

6. When installing stele pillars, where the pillars and the partitions are connected, the mortise should be bonded with C25 cement after processing. The distance between the stele should be determined according to the size of the criticism, the upper and lower spacing should be uniform, and the verticality should not exceed 2 mm , the left and right spacing is uniform.

7. Complementary installation should be based on different sizes, use the material of processing tombstone writing brush, use C25 cement to bond, and unify the surrounding spacing.

8. The installation of the stone tower on the tombstone should be cemented with C25 cement, the surrounding interval should be uniform, and the verticality error should not exceed 2 mm.

9. Generally, the restoration should be protected by cement slope, which is made of C20 diluted concrete, and the restoration bottom plate is coated for 4 weeks, and the surface is polished.

10. Summary of tombstone wholesale manufacturers: After the tombstone is installed, polish all the adhesive joints, promptly clean up the surrounding broken stones, garbage and all materials used during installation, so that the tombstone and its surroundings are clean.