What are the construction processes of landscaping and garden projects?

Landscaping project is a project to build a landscape garden oasis. Landscaping is a place to provide people with a good rest, cultural entertainment, close to nature, and meet people's desire to return to nature. It is an important measure to maintain the ecological environment and improve the urban living environment.

Landscaping generally refers to environmental construction projects including garden construction projects in oasis and scenic spots in garden cities, including garden construction projects, earthworks, garden mountain building projects, garden water management projects, garden paving projects, beautification projects, etc. It is the use of engineering technology to express garden art, so that the engineering structures on the ground and the garden landscape are integrated.

The detailed process of landscaping and garden engineering construction is:

1) Arrangement site All wastes, weeds and sundries in the construction site shall be comprehensively arranged.

2) The site is flat. Strictly follow the design standards and landscape requirements. The earthwork is backfilled to the design elevation, and the site is excavated. The thickness of the soil layer for turf cultivation is not less than 30cm, the thickness of the soil layer for flower bed cultivation is not less than 40cm, and the thickness of the soil layer for tree cultivation is not less than 40cm. Not less than 70cm, the crushed topsoil is arranged into a plane or curved surface that meets the requirements, and the sloping and sloping operations are carried out according to the design requirements of the drawings. The elevation meets the requirements, and there are special circumstances to negotiate with the owner.

3) Setting out the line and the fixed point According to the scale of the design drawing, reflect the location layout of various trees in the design drawing to the practice site to ensure that the seedling layout meets the practical requirements. Adjust properly.

4) Digging cultivation holes and applying basal fertilizer The arbor cultivation holes are mainly circular, and the flower and shrubs use strip holes, and the cultivation holes are about 30cm larger than the diameter of the root ball of the tree. The basal fertilizer is applied according to the operation instructions.

5) Seedling standards and when selecting seedlings for transportation, the error between the seedling standards and the design standards shall not exceed 5%, and the seedlings shall be selected according to the design standards. Trees and shrubs shall be packed with straw ropes and poufs, and the branches and leaves shall be properly trimmed to avoid the influence of excessive water evaporation. Survival rate.

6) The cultivation of seedlings shall be carried out according to the instruction booklet for the cultivation of seedlings, and the trees shall be fixed with maintenance piles. The cultivation of seedlings shall be constructed in the order of large trees--medium, small trees--shrubs--ground cover--turf.

7) Cultivation and irrigation No matter what kind of weather and what kind of seedlings are planted, a sufficient amount of fixed root water should be poured. And the branches and leaves should be sprayed to keep moisture.

8) Post-construction finishing The wastes formed after construction are sorted out and transported in time to ensure that the oasis and nearby grounds are clean. It does not affect the overall property operation of the owner.